Anthony Allega Cement Contractor, Inc.

Generations Party Center

Chesterland, Ohio

The Generations Center is a new 17,000 square foot facility located on a semi-wooded lot in Chesterland, GenerationOhio, which features gorgeous landscaping as well as asphalt and concrete parking lots.This project is being built in a design/build format working closely with the owner to ensure the exact facility that is needed and desired is constructed, which includes a new restaurant, party center with multiple party rooms, and the new home of Guido’s Pizza Haven - all in the same building. By working with the owner and the architect, Allega helped to design a restaurant/party center that meets the needs of today’s catering, future catering, and restaurant needs.

GenerationThe family-owned restaurant seats 80 people. The spacious, top-of-the-line kitchen serves both the restaurant and party center. Smaller parties will be able to be held in an intimate party room, known as the Western Reserve Room, which features an interior fireplace, adding to the ambiance and festive atmosphere. This area is currently under construction. Additionally, two individual, large banquet halls can be combined into one large great room and will seat 300 people. This party center will be available to rent out for special events and occasions such banquets or weddings when construction is complete.

The Generations Center features custom millwork throughout as well as the highest quality in material and workmanship. Heated, mesa buff-colored sidewalks will allow easier access to the Generations Center while enhancing safety and convenience for the guests. The building also meets all ADA requirements. State of the art smoke and heat detection as well as fire alarm systems have also been installed, ensuring the public’s safety while at Generations Center.Generation In addition, Allega installed a generator to supply power to the building so that no event will be disrupted or cancelled due to power outages or weather.

The building shell construction commenced work in 2013 and was complete later that year. The restaurant buildout was completed in 2014 and is now a fully operational part of the facility. The remaining buildout of the party center continues and is expected to be completed in 2016.

Allega is the general contractor for this project in charge of managing all aspects of construction.

 

GenerationGeneration


 

 

 

 

 

 

 

 

 

Generation

>> Back to list of Current Projects